Funds
The average person, and most of the PCs are of average
wealth levels, has next to no savings. We shall here generalize the estimated
group money as follows; 2,000, cash + 5,000 credit card + 10,000 general bank
loan x12 people = $ 204,000
Fund raising by credit card applications over a 2 month
period results in the following;
Scott "trucker" 9x2000
= 18,000
May Lin 5x2000 = 10,000
Kateri 9x2000 = 18,000
Ranger Bob 7x2000
= 14,000
Kellyanna 6x2000
= 12,000
Farmer Brown 5x2000 =
10,000
Doc 17x5000
= 85,000
Grunt 8x5000 = 40,000
Doreen 11x2000
= 22,000
Ray Frasier 7x2000 = 14,000
Yvan 9x2000
= 18,000
Sub Total $
261,000
Farm Loan* +120,000 ( +20,000 each year for next 4 years )
Basic moneys +
204,000
Total $ 585,000
Expenses
The land in Migic, 240 acres, $300,000 / 10% down payment
required = $30,000
Road repair labour and materials = $8,000
Clearing of forest for building and farm fields = 12,000$
The ISO containers; at super cheep from New York harbour $100 / 20ft box
20ft x 150 x $100 = $15,000
Shipping from NY to Halifax,
using Russian freighter; 50 box / $20,000 per trip.
Delivery from Halifax
to Migic by truck; 2 box / $500 per trip.
Total ISO cost $113,000
The 9,000 gallon tanker of diesel fuel = $20,000
Used full size tractor for farm = $12,000
Food supply for 40 people for 1 year = $35,000
Shelving for basement storage; 20$ each x20 / room x12 = 4,800$
Hover craft kits, 1 small 2 person trainer + 2 large 16
person movers = $25,000
Expenses section 1 total = $259,800
Construction supplies –
Stairs: 4 sets, 4 levels tall = 4,600$
Pine paneling: 256$ per room x22 (1st floor) x 20 (2nd
floor) = 10,880$
Water resistant dry wall: 448$ per bathroom x4 + water
closets = 2,240$
Electrical wires: 100$ for 75m, about 15 rolls = 1,500$
Light Switch: 10 pack, 1 per container about 160, 17 packs
x10$ = 170$
Floor tiles (for bathrooms & wet rooms) average 1$ sq
ft. about 2,080$
Interior floor finishing; Varathane polyurethane $17 / 4
gallon x 70 = 1,190$
Wall mount lamp 10$ each + LED bulb 50$ each. Total: 9,000$
Plywood to finish the ceiling of rooms & hallway: 10$
panel x 5 per container. 3,000$
Wood screws box of 1600 for $100 x 8 = $800
2x4x8 wood studs $2 each x 1000 = 2,000$
Exterior doors; 6 steel x 900$ + 6 cheep x 220$ = 6,720$
Interior doors; 32 cheep x 60$ = 1,920$
Windows big 60x48” at 290$ x62 = 17,980$ + security bars
100$x62 = 6,200$
Windows small 24x24” at 140$ x 32 = 4,480$ + security bars
50$x32 = 1,600$
Expenses section 2 sub total = 76,360$
with an expected 20% discount gives a total of about $
62,000
Labour –
Plumber, special friend rate, 20$/hour x8/day x15days =
2,400$
General workers 5 men at $10/hour x8/day x30 days = 12,000$
Hire of crane and crew to place ISO boxes, $2000 / day =
20,000$
Expenses section 3 total = $34,400
Summary so far –
Funding available is
about $ 585,000. Expenses listed here run about $ 356,000.
Please note there are many expenses not yet calculated,
including the cost of a well and the geothermal / heating system for the
building. Also there is a growing list of tools and equipment wanted for
several types of work shops.
No comments:
Post a Comment